Build a new home in your garden in Warwick

Our garden design and build service is for Warwick owners who want to keep their land and have a new home built on it, managed from the first appraisal to handover. We cover Warwick and the places around it, and manage every stage for you.

The order of work is clear. Appraisal and survey come first, then design and the planning application, then Building Regulations, the warranty, utility applications and a written quote. Only then does construction start, in stages with inspections, ending with a handover pack you can pass to a buyer, tenant or family member.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Warwick District Council
Postcodes
CV34
Noon sun, 21 March
About 38°
Shadow from a 5 m eaves line
About 6.5 m
Planning plan
Local Plan
County
Warwickshire

How it plays out in Warwick

Daylight is one of the first things Warwick District Council will check on a garden house. At midday on 21 March the sun in Warwick stands roughly 38° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.5 m. On 21 December the sun is only about 14° up and shadows stretch far longer.

That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.

Section showing noon sun and shadows in Warwick: about 38 degrees on 21 March and 14 degrees on 21 December21 m21 Mar, noon: sun 38°, shadow 6.5 m21 Dec, noon: sun 14°, shadow 19.6 mExistingNew home
This section is worked out for the latitude of Warwick: around 38° of sun at midday in late March and about 14° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

How we’d take it forward in Warwick

If your Warwick plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.

Questions about garden plots in Warwick

Will I pay Community Infrastructure Levy on a new home in Warwick?

Only if Warwick District Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Can I build a house in my garden in Warwick and keep the land?

Yes. On our design and build route you remain the owner while we design the home, apply to Warwick District Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.

How long does planning take for a new home in a Warwick garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Can I build a house in my Warwick garden and then sell it?

Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.

Other options in Warwick

Build in your garden near Warwick

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.