- Planning authority
- North Tyneside Council
- Postcodes
- NE7, NE28
- Noon sun, 21 March
- About 35°
- Shadow from a 5 m eaves line
- About 7.1 m
- Planning plan
- Local Plan
- County
- Tyne and Wear
What shapes a plot in Wallsend
A measured survey in Wallsend records the plot exactly: boundaries, levels, trees, drains, and the positions and heights of neighbouring windows. It is the base for everything else. From it we can plot the shadow a two-storey eaves line would cast, roughly 7.1 m at noon on 21 March when the sun is near 35° here, and the distances between the new home and the houses around it. North Tyneside Council will expect the application drawings to be accurate to a survey like this.
From first call to decision
The next step is a free appraisal of your Wallsend garden. We look at the access, the shape of the plot, the title plan and the main planning constraints, then talk it through with you. Where the plot shows promise, we set out the surveys and design work it needs, with a written price for each stage, and you decide how far to take it.
Free plot appraisal
A desktop look at your plot, access, title plan and the planning picture, plus a conversation about what you want. If it looks viable we visit. There’s no cost and no obligation at this stage.
Scope and written quote
If you want to go further, we set out which surveys and checks your plot needs and what they will cost, in writing. Nothing is commissioned until you have agreed the scope and the price.
Access and capacity study
We test each workable route in and the number, size and position of homes the plot could hold, against separation distances, garden space, parking, bins and daylight for neighbours.
Feasibility report and options
A clear yes, no or maybe, the reasons behind it, and the routes open to you: apply for planning, build, sell or partner. You decide what happens next, with no obligation to use us for it.
Worth checking early
- A feasibility study can end in a no; finding that out early costs far less than a refused application.
- Pre-application advice is not binding, and the council’s decision on a formal application can still differ.
- Title problems such as covenants, ransom strips or missing rights of way can take time and money to resolve.
Questions about garden plots in Wallsend
How do I know if my garden in Wallsend is big enough for a house?
Size alone won’t tell you. What matters is whether there is a workable access, enough distance from neighbours’ windows, room for gardens, parking and bins for both homes, and nothing on the title or in policy that rules it out. A feasibility study checks each of those for your plot. The first stage, a free plot appraisal, gives you an early view.
How much does a feasibility study cost in Wallsend?
It depends on the plot. A simple garden with a clear drive needs less work than one with protected trees, a flood zone or a complicated title. The first appraisal is free. After that we set out the scope and the price in writing, and you choose whether to go ahead before anything is commissioned.
Can I get pre-application advice on a garden plot in Wallsend?
Usually, yes. Most councils offer pre-application advice, and many charge a fee for it. North Tyneside Council’s website sets out its current arrangements, including how to apply, what to send and how long a response usually takes. We can prepare the information and attend any meeting for you. The advice isn’t binding, but it is a useful test before a full application.
What if my Wallsend garden plot fails the feasibility check?
Then you know before spending money on a planning application, and you know why. Sometimes a smaller scheme, an annexe, or working with the neighbours next door changes the answer, and we will say if so. If nothing does, you keep the survey and the report for the future. You are under no obligation to us either way.
Other options in Wallsend
- Planning permission for a garden plot
- Joint venture on your garden plot
- Large rear gardens
- Sell part of your garden
- Combine gardens with your neighbours
- Garden plot option agreement

