- Planning authority
- Wokingham Borough Council
- Postcodes
- RG2, RG6, RG41
- Noon sun, 21 March
- About 39°
- Shadow from a 5 m eaves line
- About 6.3 m
- Planning plan
- Local Plan
- County
- Berkshire
Before you decide in Earley
Once Wokingham Borough Council registers a valid application, it publicises it with neighbour letters, a site notice or both, and usually lists it online. Specialist consultees — the highway authority, for instance, or the council’s arboricultural officer — are invited to comment too.
Neighbours across RG2, RG6 and RG41 will normally get a minimum of 21 days to respond. We monitor comments as they arrive and, where an objection raises a genuine point, look at whether a modest change to windows, screening or the access would answer it. We keep you informed throughout, so nothing in the officer’s report comes as a surprise.
What happens next in Earley
To start, send us your Earley address and a few photos of the garden, or give us a call. We check the title, access, constraints and nearby planning history, then talk it through with you. If the plot looks viable, we visit, explain whether an application is worth making and set out our fee and likely survey costs in writing.
Free plot appraisal
We review the title plan, access, constraints, policy and planning history around your address, then talk it through with you. If the plot looks viable we visit, and tell you plainly whether an application is worth making.
Surveys and design
A measured survey comes first, followed by the specialist surveys the plot needs, such as trees or ecology. The layout is designed around access, privacy, daylight, parking, bins and garden space for both homes.
Pre-application advice
Where policy is tight or the plot unusual, we put a draft scheme to the council’s planners first. Their written response shows which issues to fix before you pay the full application fee.
Decision and next steps
If permission is granted, we explain every condition and what must happen before work starts. If it’s refused, we review the reasons with you and set out the options: amend and resubmit, appeal, or stop.
Worth checking early
- Planning is the council’s decision; even a well-prepared application can be refused, and the costs of preparing it aren’t recovered.
- Conditions can add cost and work before building starts, such as approved drainage details, tree protection or a construction management plan.
- Permission doesn’t override private rights: covenants, ransom strips, sewer easements and party wall matters still need dealing with separately.
Earley: questions to ask
What documents are needed for a garden plot application in Earley?
Wokingham Borough Council publishes a local validation list, as every council does. Typically you need the forms, a location plan with the site and access edged in red, a site plan, floor plans, elevations, an ownership certificate and the fee, plus reports the plot calls for, such as trees, ecology, drainage and access. We prepare to the list for your address.
What if my Earley garden application is refused?
You can submit a revised application that addresses the reasons for refusal, appeal within 6 months of the decision date, or decide not to go further. Appeals go to the Planning Inspectorate in England or Planning and Environment Decisions Wales. We review the refusal and the officer’s report with you before recommending a route.
How long will my Earley garden plot application take?
The statutory period for a minor application, such as one or a few new homes, is 8 weeks from validation, in both England and Wales. Many take longer, and the council may ask you to agree an extension in writing. If no decision is made in time and no extension is agreed, you can appeal for non-determination.
Is pre-application advice available in Earley?
Most planning authorities, including Wokingham Borough Council, offer pre-application advice, usually for a fee, with their own response times. It isn’t compulsory and doesn’t bind the final decision, but for a garden plot with a tight access, strict policy or an earlier refusal, it can show which issues to resolve before you apply formally.
Other options in Earley
- Build a home for family in your garden
- Large rear gardens
- Plot feasibility and design
- Planning promotion for your garden plot
- Sell subject to planning
- Build a new home in your garden

