Build a new home in your garden in Earley

Building a second home behind your own in Earley is a construction project with one unusual feature: you live beside the site from the first spade to the last coat of paint. That shapes how we plan it, from the fence that separates your garden on day one to where deliveries park.

The route covers everything between an idea and a finished house. We survey and design, prepare and submit the planning application, arrange Building Regulations approval and the structural warranty, organise new water, drainage and electricity connections, and then build. You keep ownership of the land throughout.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Wokingham Borough Council
Postcodes
RG2, RG6, RG41
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.3 m
Planning plan
Local Plan
County
Berkshire

What shapes a plot in Earley

We cover gardens in Earley and nearby places such as Woodley, Reading and Wokingham, with the same process wherever you are: a free desktop appraisal, a visit if the plot looks viable, then survey and design.

Some of those places may fall under a different council from Wokingham Borough Council, and each local planning authority has its own design guidance, validation list and pre-application service. We confirm which authority covers your address at the start, so the application is prepared for the right requirements first time and avoids delays at validation.

Section showing noon sun and shadows in Earley: about 39 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.3 m21 Dec, noon: sun 15°, shadow 18.5 mExistingNew home
This section is worked out for the latitude of Earley: around 39° of sun at midday in late March and about 15° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

What happens next in Earley

Once you ask for an appraisal of your Earley garden, we start with the paperwork: the title plan, any covenants, flood maps, tree and conservation designations, and planning decisions on nearby plots. A short call follows, then a site visit if the plot passes the desk check. You get our straight view of what’s realistic and what happens next, with no obligation to go further.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.

Earley: questions to ask

How long does planning take for a new home in a Earley garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Can I build a house in my garden in Earley and keep the land?

Yes. On our design and build route you remain the owner while we design the home, apply to Wokingham Borough Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.

Can the new home in my Earley garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Will I pay Community Infrastructure Levy on a new home in Earley?

Only if Wokingham Borough Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Other options in Earley

Build in your garden near Earley

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.