- Planning authority
- Medway Council
- Postcodes
- ME1
- Noon sun, 21 March
- About 39°
- Shadow from a 5 m eaves line
- About 6.3 m
- Planning plan
- Local Plan
- County
- Kent
How it plays out in Rochester
Replacing a bungalow in ME1 with two or more homes needs planning permission for the new homes, and Medway Council will look closely at the number of homes, their height, parking, bins and garden space for each household.
A replacement can sometimes fit better than squeezing a new home behind a bungalow that stays, because the whole plot can be laid out from scratch. Neighbours are consulted either way, and a design that respects single-storey homes next door usually meets fewer objections.
The next steps, locally
After a free appraisal, we set out what could realistically fit on your Rochester plot: a home behind, a home beside, or a replacement scheme. You choose the route that suits you, whether that’s selling, partnering or having us build, and only then do we start on drawings and planning work. Nothing is spent on design until you’ve decided.
Free plot appraisal
We look at the plot’s width and depth, the access, the planning history nearby and the character of the street, then talk through what you want. It’s free, with no obligation, and a site visit follows if it looks viable.
Choose your route
You can sell a plot and stay put, sell subject to planning, grant an option, enter a joint venture, or keep the land and have us design, get planning for and build a new home on it.
Planning application
We prepare drawings and reports designed around single-storey neighbours and the street scene, usually seek pre-application advice, and submit. The council consults neighbours and makes the decision.
Sale or build
If you sell, your solicitor handles the transfer and any lender release. If we build, you receive a written quote after design and survey, and the new home is built and handed over to you.
Worth checking early
- Covenants on older estates can limit building, and resolving one takes time and may cost money.
- The order in which you sell the plot and the bungalow can affect your tax, so take advice first.
- A two-storey home on a road of bungalows is often resisted, so designs may need to stay low.
Your questions, answered for Rochester
How long does planning for a bungalow plot in Rochester usually take?
It varies. Surveys and design often take a few weeks to a few months, then the council needs time to decide. Pre-application advice, extra reports or design changes can add time. We give you a realistic idea after the appraisal.
Do I need to sell my Rochester bungalow to develop the plot?
No. You can keep the bungalow and sell a plot, have us build on the land for you, or enter a joint venture. Replacing the bungalow is only one of several options, and staying put is often simpler.
Is it worth replacing my bungalow in Rochester with more homes?
Sometimes, where the plot is large and the bungalow is dated or poorly placed. Replacement can fit more homes than building behind, but you would need to move out during the work. We compare both approaches for your plot during the appraisal.
Will Medway Council allow a two-storey house next to bungalows in Rochester?
It depends on the street and the design. Councils are often cautious about two-storey homes among single-storey neighbours because of overlooking and the change to the street. Chalet designs with rooms in the roof are a common compromise, but the council decides.
Other options in Rochester
- Joint venture on your garden plot
- Garden plot option agreement
- Build a home for family in your garden
- Corner and side plots
- Sell subject to planning
- Combine gardens with your neighbours

