New homes on garage courts and yards in Barnet

Before you give notice to garage tenants in Barnet or pay for drawings, check that the basics stack up. Can the lane take more cars and a bin lorry? Who has the right to cross the court? Is there asbestos in the roofs, or anything in the ground?

Our free appraisal deals with each of those, working from the title, maps and planning records before any visit. By the end you’ll have a clear view of whether to sell or build, roughly how many homes the site might take, and the points the London Borough of Barnet is likely to press on.

Row of old lock-up garages in a tarmac court behind a terrace of brick houses
Planning authority
London Borough of Barnet
Postcodes
EN5, N3, N12, N20, NW4
Noon sun, 21 March
About 38°
Shadow from a 5 m eaves line
About 6.3 m
Planning plan
Local Plan
County
Greater London

Barnet: light, access and policy

Garage courts near you, whether in Barnet or in Brent, Haringey and Camden, may already have been turned into homes. Where that has happened, it hints at what the council will accept, but no earlier decision binds it and each scheme is weighed afresh against current policy.

The local rules sit in the council’s Local Plan, together with whatever design or parking guidance the London Borough of Barnet has adopted. We check those and the history of nearby courts, so your scheme begins from a realistic footing.

Section showing noon sun and shadows in Barnet: about 38 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 38°, shadow 6.3 m21 Dec, noon: sun 15°, shadow 18.7 mExistingNew home
This section is worked out for the latitude of Barnet: around 38° of sun at midday in late March and about 15° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

The next steps, locally

A garage enquiry from Barnet can open with a phone call and a handful of photos showing the court, the lane and the roofs. We then run a desktop check and visit if the site deserves it. Sellers move on to heads of terms, handled by their solicitor; owners who want to build move on to surveys, design and a written quote.

  1. Free site appraisal

    We look at the site on maps, the title plan and the planning history, then talk through who uses it now. If it looks workable we visit. There’s no cost and no obligation.

  2. Rights and title review

    We map who has rights over the court and lane, which garages are let and on what terms, and whether any covenants, charges or strips of land you don’t own could block a scheme.

  3. Choose your route

    Sell the site outright or subject to planning, grant an option, or keep it and have us design, get planning for and build. Garage tenancies and licences are ended properly before any work starts.

  4. Planning, then sale or build

    We prepare and submit the application and the council decides. If you sell, your solicitor handles the transfer. If you build, a written quote follows design and survey, then demolition and construction.

Worth checking early

  • Asbestos, contamination and bat surveys add cost and time before demolition can start.
  • Ending garage tenancies or licences takes time, and some tenants may have legal protection; get legal advice before serving notice.
  • A narrow or unadopted lane can restrict the number of homes, or require sprinklers, a turning space or bin collection point.

Your questions, answered for Barnet

Can you build homes on my yard in Barnet if I keep it?

Yes. You keep ownership while we handle the lot: surveys, demolition of the old buildings, design, the planning application, construction and the structural warranty that buyers’ lenders tend to need. A written quote is given once design and survey are complete; guide prices before then are only guides.

Can I build houses on my garage block in Barnet?

Possibly, if the lane works for cars, bins and emergency access, neighbours’ privacy and light are protected, and rights over the site can be dealt with. Homes there need planning permission, which is the London Borough of Barnet’s decision. A free appraisal shows whether the site merits going further.

Who has the final say on a Barnet garage court scheme?

The London Borough of Barnet, as the local planning authority. Officers weigh the scheme against the council’s Local Plan and national policy, plus highways and design guidance, after hearing from neighbours and the highway authority. We put the application together and answer the officer’s questions, yet the verdict is never ours to give.

Do I need an asbestos survey for garages in Barnet?

Yes, before demolition. Health and Safety Executive guidance says a refurbishment and demolition survey must find asbestos before structural work begins. Older garage roofs are often asbestos cement sheeting. Specialists carry out the survey and removal, and we build both into the plan.