- Planning authority
- Stevenage Borough Council
- Postcodes
- SG1
- Noon sun, 21 March
- About 38°
- Shadow from a 5 m eaves line
- About 6.4 m
- Planning plan
- Local Plan
- County
- Hertfordshire
What the council will look at in Stevenage
Parking is a common worry on garage court schemes, in Stevenage as elsewhere. If people living in SG1 use the garages, the council may ask where those cars will go once the site is built on. Showing how many garages actually hold cars, rather than storage, can make a real difference.
The new homes need parking of their own, along with turning space, bin storage and room for fire engine access (or other measures, often sprinklers, agreed with building control and the fire service where a fire engine can’t get close enough). Stevenage Borough Council will look at all of it, so we plan the lane and parking before the homes themselves.
The next steps, locally
Here’s what happens after you contact us about a garage site in Stevenage. We look at the title plan, maps and the planning history, then call you to talk through who uses the garages and the lane. If the site looks viable we visit, check access, buildings and neighbours, and send a plain summary of the options, with no obligation.
Free site appraisal
We look at the site on maps, the title plan and the planning history, then talk through who uses it now. If it looks workable we visit. There’s no cost and no obligation.
Rights and title review
We map who has rights over the court and lane, which garages are let and on what terms, and whether any covenants, charges or strips of land you don’t own could block a scheme.
Choose your route
Sell the site outright or subject to planning, grant an option, or keep it and have us design, get planning for and build. Garage tenancies and licences are ended properly before any work starts.
Planning, then sale or build
We prepare and submit the application and the council decides. If you sell, your solicitor handles the transfer. If you build, a written quote follows design and survey, then demolition and construction.
Worth checking early
- Asbestos, contamination and bat surveys add cost and time before demolition can start.
- Ending garage tenancies or licences takes time, and some tenants may have legal protection; get legal advice before serving notice.
- Rights of way over the court or lane can limit what you can build, and some arise from long use rather than the title.
Stevenage: questions to ask
Who has the final say on a Stevenage garage court scheme?
Stevenage Borough Council, as the local planning authority. Officers weigh the scheme against the council’s Local Plan and national policy, plus highways and design guidance, after hearing from neighbours and the highway authority. We put the application together and answer the officer’s questions, yet the verdict is never ours to give.
Can you build homes on my yard in Stevenage if I keep it?
Yes. You keep ownership while we handle the lot: surveys, demolition of the old buildings, design, the planning application, construction and the structural warranty that buyers’ lenders tend to need. A written quote is given once design and survey are complete; guide prices before then are only guides.
Is the lane to my Stevenage garages wide enough?
It depends on the lane, the number of homes and local highway standards. The council will look at width, visibility at the street and the effect on neighbours. Fire and bin access matter too. A narrow lane may limit the number of homes rather than ruling the site out.
Can neighbours in Stevenage block a garage court scheme?
Neighbours are consulted and can object, and those with a legal right of way over the court have rights the scheme must respect. Objections alone don’t decide the outcome. We map every right first and design to keep routes open where they are needed.
Other options in Stevenage
- Large rear gardens
- Combine gardens with your neighbours
- Sell part of your garden
- Build a new home in your garden
- Corner and side plots
- Joint venture on your garden plot

