- Planning authority
- Sefton Metropolitan Borough Council
- Postcodes
- L20, L22
- Noon sun, 21 March
- About 37°
- Shadow from a 5 m eaves line
- About 6.7 m
- Planning plan
- Local Plan
- County
- Merseyside
How it plays out in Bootle
Parking is a common worry on garage court schemes, in Bootle as elsewhere. If people living in L20 and L22 use the garages, the council may ask where those cars will go once the site is built on. Showing how many garages actually hold cars, rather than storage, can make a real difference.
The new homes need parking of their own, along with turning space, bin storage and room for fire engine access (or other measures, often sprinklers, agreed with building control and the fire service where a fire engine can’t get close enough). Sefton Metropolitan Borough Council will look at all of it, so we plan the lane and parking before the homes themselves.
How we’d take it forward in Bootle
From here the pace is yours. A sale only proceeds once heads of terms are in writing and you’re happy with them; a build only proceeds once surveys, design and a written quote are in front of you. Garage tenancies are brought to an end under their own terms, on legal advice. Sefton Metropolitan Borough Council then consults neighbours on the application and makes the decision.
Free site appraisal
We look at the site on maps, the title plan and the planning history, then talk through who uses it now. If it looks workable we visit. There’s no cost and no obligation.
Site checks and layout
We look at the access lane, the buildings, likely asbestos and contamination, drains and neighbours’ windows, then sketch what could realistically fit, from one home to a small group, or nothing at all.
Choose your route
Sell the site outright or subject to planning, grant an option, or keep it and have us design, get planning for and build. Garage tenancies and licences are ended properly before any work starts.
Planning, then sale or build
We prepare and submit the application and the council decides. If you sell, your solicitor handles the transfer. If you build, a written quote follows design and survey, then demolition and construction.
Worth checking early
- Neighbours whose gardens back onto the court are consulted and may object; the council decides.
- A narrow or unadopted lane can restrict the number of homes, or require sprinklers, a turning space or bin collection point.
- Ending garage tenancies or licences takes time, and some tenants may have legal protection; get legal advice before serving notice.
Bootle: questions to ask
Can you build homes on my yard in Bootle if I keep it?
Yes. You keep ownership while we handle the lot: surveys, demolition of the old buildings, design, the planning application, construction and the structural warranty that buyers’ lenders tend to need. A written quote is given once design and survey are complete; guide prices before then are only guides.
Who has the final say on a Bootle garage court scheme?
Sefton Metropolitan Borough Council, as the local planning authority. Officers weigh the scheme against the council’s Local Plan and national policy, plus highways and design guidance, after hearing from neighbours and the highway authority. We put the application together and answer the officer’s questions, yet the verdict is never ours to give.
Can I build houses on my garage block in Bootle?
Possibly, if the lane works for cars, bins and emergency access, neighbours’ privacy and light are protected, and rights over the site can be dealt with. Homes there need planning permission, which is Sefton Metropolitan Borough Council’s decision. A free appraisal shows whether the site merits going further.
What does it cost to have my Bootle garage site assessed?
Nothing. Our assessment is free, with no obligation. We review the title, maps and planning history and speak to you before deciding whether a visit is worthwhile. You’re only committed after choosing a route and agreeing terms set out in writing.
Other options in Bootle
- Sell subject to planning
- Combine gardens with your neighbours
- Garden plot option agreement
- Build a home for family in your garden
- Planning promotion for your garden plot
- Bungalows on large plots

