- Planning authority
- Isle of Wight Council
- Postcodes
- PO33, PO34
- Noon sun, 21 March
- About 39°
- Shadow from a 5 m eaves line
- About 6.1 m
- Planning plan
- Local Plan
- County
- Isle of Wight
The local picture in Ryde
A home placed behind another changes the light as well as the traffic. In Ryde the sun peaks at roughly 39° in late March and barely 16° at the winter solstice, so shadows from even a modest building stretch a long way across a garden in the darker months.
That is why many tandem schemes use a single-storey or low-eaves design. It keeps upstairs windows from looking over neighbours and limits shadow. Isle of Wight Council decides, and its own guidance on separation distances sets the gaps it expects.
The next steps, locally
We take a Ryde plot with tricky access forward in three stages. First the legal access, confirmed with your solicitor. Then a layout that answers the questions Isle of Wight Council asks about tandem and backland homes. Then the route you chose, whether that’s a sale, an option or a build. You can stop at any stage before signing.
Free plot appraisal
We start with the access, not the plot: title plans, rights of way, the width on the ground and the route to the road. It’s a desktop check and a conversation, with a site visit if it looks viable, at no cost.
Title and access check
With your solicitor we confirm who owns every strip between the plot and the road, what rights already exist and whether they cover a new home. Any ransom strip or missing right shows up at this stage.
Secure the way in
If a right of way needs widening, a strip needs buying or a neighbour needs to come in, we agree the approach with you and negotiate it, so the terms are settled before planning money is spent.
Planning application
We design a layout that answers the access, privacy and neighbour questions councils ask about tandem and backland plots, then apply. The council consults neighbours and decides, and the decision is always the council’s.
Worth checking early
- A right of way that has served a garage or field for years may not legally cover a new house.
- Access is usually the deciding factor on these plots, so a large plot with a poor way in may not be a building plot at all.
- Tandem layouts affect the front house’s privacy and quiet, and councils weigh that carefully.
Your questions, answered for Ryde
Can I get planning permission in Ryde before the access is sorted?
You can apply for planning on land you don’t own, as long as the owners are formally notified. But permission doesn’t give a right to cross anyone’s land. Most of the time it makes sense to agree access terms first, so the permission can actually be used.
Will Isle of Wight Council accept a shared drive for a new home in Ryde?
It can, but shared drives are looked at closely. The council will consider the width, visibility at the road, the effect on the house beside the drive, and whether fire and bin access work. A drive with a clear gap from windows and screening alongside generally fares better.
Can I build behind my house in Ryde if the only way in is my drive?
Possibly. That would be a tandem layout, with the new home behind yours sharing your drive. Isle of Wight Council will look at the effect of cars passing your house, privacy, garden space and whether it suits the area. Fire and bin access also need checking. The decision is the council’s, and a good design improves the odds.
How long does sorting access on a Ryde plot usually take?
It varies. Confirming an existing right of way can take a few weeks of solicitor time. Negotiating with a neighbour or a ransom strip owner often takes longer, and depends on how quickly everyone agrees and takes advice. Once we’ve seen the title and the route, we can give you a sensible estimate.
Other options in Ryde
- Planning promotion for your garden plot
- Sell subject to planning
- Large rear gardens
- Sell part of your garden
- Planning permission for a garden plot
- Build a home for family in your garden