Sell your garden plot subject to planning in Dorking

A sale subject to planning sits halfway between selling your Dorking garden plot outright and waiting to see what happens. It commits us from exchange, so you aren’t left with an offer that can quietly fade, but it doesn’t move any land until Mole Valley District Council has granted permission.

We’re a new brand within the S&K Group, so we won’t claim a long track record. What we can offer is a contract you can read, a price set before the decision, and a scheme designed carefully around the council’s Local Plan. Your own solicitor checks everything before you sign.

Site plan and house elevation drawings on a kitchen table with the back garden beyond the window
Planning authority
Mole Valley District Council
Postcodes
RH4
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.2 m
Planning plan
Local Plan
County
Surrey

Dorking: light, access and policy

Overshadowing is one of the first things a planning officer checks on a garden scheme. In Dorking, the spring equinox sun reaches only about 39° at midday, which means a 5 m eaves line lays down a shadow around 6.2 m long. Come the shortest day, the sun climbs no higher than roughly 15° and the shade stretches far beyond that.

We model those shadows when we design the scheme, because a home that keeps light off your windows and the neighbours’ gardens is easier for Mole Valley District Council to approve. Sometimes that means a lower roof or a home set further back.

Section showing noon sun and shadows in Dorking: about 39 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.2 m21 Dec, noon: sun 15°, shadow 18.2 mExistingNew home
This section is worked out for the latitude of Dorking: around 39° of sun at midday in late March and about 15° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

How we’d take it forward in Dorking

Here is what to expect in Dorking. First a phone call, then a desk check of the title and the council’s Local Plan, then a visit if the plot looks promising. If we both want to go ahead, heads of terms set out what we would agree, without obligation, before solicitors draft the conditional contract. The appraisal costs nothing.

  1. Free plot appraisal

    We check your title, access, planning history and local policy from our desk, then talk it through with you. If a new home looks realistic, we visit the garden and tell you which route we think suits it best.

  2. Exchange of conditional contracts

    Both solicitors agree the contract and the plan of the plot. On exchange, both sides are bound, subject to the planning condition, and our contract is noted on your title so the plot can’t be sold elsewhere.

  3. Planning application

    We commission the surveys, prepare the drawings, seek pre-application advice where useful and submit the application, normally at our cost. You see the plans before they go in, and the council makes the decision.

  4. Completion, or you keep your land

    Once a satisfactory permission is granted and any challenge period has passed, the sale completes within the agreed time and the plot gets its own title. If permission is refused and the contract ends, the land stays yours.

Worth checking early

  • Once contracts are exchanged you are committed to sell if a satisfactory permission is granted.
  • Capital Gains Tax timing on a conditional sale can differ from an ordinary sale; take advice from a tax adviser.
  • The definition of satisfactory permission and the long-stop date decide how certain the sale really is; read both closely.

Your questions, answered for Dorking

Do I keep my garden in Dorking if planning is refused?

Yes. Nothing is transferred until a satisfactory permission is granted, so a refusal leaves the land in your ownership. Depending on the contract, we may revise the scheme and reapply, or appeal, before the long-stop date. If that doesn’t succeed, the contract ends and our notice comes off your title.

How long might a sale subject to planning take in Dorking?

It usually runs for months, sometimes longer. Exchange often takes a few months; surveys and drawings take a few more; and the Planning Portal says most applications are decided within eight weeks of being valid, though garden schemes can take longer. The long-stop date sets the outer limit, agreed with you at the start.

Will my neighbours in Dorking be told about the application?

Yes. Mole Valley District Council publicises applications through letters to neighbours, a site notice, or both, depending on its practice. Neighbours can comment, and the council weighs their views against planning policy. You can choose whether to speak to adjoining owners before the application goes in, and we’ll fit in with what you prefer.

Who decides the planning application on a conditional sale in Dorking?

That is Mole Valley District Council’s decision as the local planning authority, made under the council’s Local Plan and the National Planning Policy Framework (NPPF). We prepare the application, submit it and answer the council’s questions, but the outcome isn’t ours to control. That’s why the contract has a long-stop date and says what happens if permission is refused.

Other options in Dorking

Subject to planning near Dorking

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.