- Planning authority
- Exeter City Council
- Postcodes
- EX1, EX2, EX3, EX4
- Noon sun, 21 March
- About 39°
- Shadow from a 5 m eaves line
- About 6.1 m
- Planning plan
- Local Plan
- County
- Devon
What shapes a plot in Exeter
Wherever your house sits across EX1, EX2, EX3 and EX4, a new home behind it needs water, power and two kinds of drainage — one for waste, one for rain. We contact the utility providers early, because a long cable run, a sewer at the wrong depth or a public pipe under the lawn can change both the layout and the cost.
Rain from the new roof and drive has to be dealt with on site, and Exeter City Council will want to see how. Where a public sewer crosses your garden, the water company may also need a build-over agreement before work starts, so we check sewer records at appraisal stage.
How we’d take it forward in Exeter
From appraisal to a decision from Exeter City Council, each step in Exeter is agreed before it starts. After the site visit we quote for survey and design; after design we prepare the application; after permission we deal with conditions and technical approvals and give you a written build quote. Each stage is a separate decision for you, with its cost set out first.
Free plot appraisal
We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.
Survey and design
A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.
Written quote and build
Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.
Handover
You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.
Worth checking early
- Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
- You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
- A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
Questions about garden plots in Exeter
Do new homes in Exeter need a structural warranty?
If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.
How close can a new house be to my own in Exeter?
There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Exeter City Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.
Will I pay Community Infrastructure Levy on a new home in Exeter?
Only if Exeter City Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.
Can the new home in my Exeter garden connect to the main sewer?
Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.
Other options in Exeter
- Bungalows on large plots
- Build a home for family in your garden
- Garden plot option agreement
- Plot feasibility and design
- Tandem and landlocked plots
- Combine gardens with your neighbours