What the council will look at in Torquay
Construction on a Torquay garden plot runs to a programme agreed once Torbay Council has issued permission and any pre-commencement conditions have been dealt with. Groundworks and foundations come first; the shell and roof follow, then glazing, internal trades and, last of all, the drive and planting.
Weather matters. Around 21 December the sun in Torquay climbs to only about 16° at midday, so winter days are short and wet ground slows the work. Where we can, we order the job so the house is weathertight before the worst months arrive.
What happens next in Torquay
Getting started in Torquay takes one step from you: send your address and a few photos of the garden, or call us. We check the title plan, access and planning constraints from our desk, then talk the plot through. If it looks viable we arrange a visit, discuss whether you want to sell, let or keep the new home, and set out the survey and design stage in writing before you commit.
Free plot appraisal
We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.
Planning and approvals
We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.
Written quote and build
Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.
Handover
You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.
Worth checking early
- A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
- You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
- Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
Torquay: questions to ask
Can the new home in my Torquay garden connect to the main sewer?
Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.
How long does planning take for a new home in a Torquay garden?
The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.
How close can a new house be to my own in Torquay?
There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Torbay Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.
Will I pay Community Infrastructure Levy on a new home in Torquay?
Only if Torbay Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.
Other options in Torquay
- Large rear gardens
- Garage courts and yards
- Build a home for family in your garden
- Joint venture on your garden plot
- Plot feasibility and design
- Corner and side plots