Build a new home in your garden in Brixham

Keep the land, gain a home: that is the design and build route we offer to garden owners in Brixham. Instead of selling a plot to a developer, you commission the new house yourself, with us managing design, planning, approvals and construction on your behalf.

It suits owners who can fund a build, or arrange finance for one, and who want the finished home rather than a land sale. If that isn’t you, our sell-or-partner routes may fit better, and the free appraisal compares both for your plot so you can choose with the facts in front of you.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Torbay Council
Postcodes
TQ5
Noon sun, 21 March
About 40°
Shadow from a 5 m eaves line
About 6.0 m
Planning plan
Local Plan
County
Devon

What the council will look at in Brixham

Wherever your house sits across TQ5, a new home behind it needs water, power and two kinds of drainage — one for waste, one for rain. We contact the utility providers early, because a long cable run, a sewer at the wrong depth or a public pipe under the lawn can change both the layout and the cost.

Rain from the new roof and drive has to be dealt with on site, and Torbay Council will want to see how. Where a public sewer crosses your garden, the water company may also need a build-over agreement before work starts, so we check sewer records at appraisal stage.

Section showing noon sun and shadows in Brixham: about 40 degrees on 21 March and 16 degrees on 21 December21 m21 Mar, noon: sun 40°, shadow 6.0 m21 Dec, noon: sun 16°, shadow 17.2 mExistingNew home
Noon sun in Brixham on 21 March sits about 40° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.0 m. In December the sun is only about 16° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

What happens next in Brixham

From appraisal to a decision from Torbay Council, each step in Brixham is agreed before it starts. After the site visit we quote for survey and design; after design we prepare the application; after permission we deal with conditions and technical approvals and give you a written build quote. Each stage is a separate decision for you, with its cost set out first.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.

Brixham: questions to ask

Do new homes in Brixham need a structural warranty?

If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.

Can I build a house in my garden in Brixham and keep the land?

Yes. On our design and build route you remain the owner while we design the home, apply to Torbay Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.

Can the new home in my Brixham garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Will I pay Community Infrastructure Levy on a new home in Brixham?

Only if Torbay Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

Other options in Brixham

Build in your garden near Brixham

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.