Build a new home in your garden in Paignton

If you own a house in Paignton with a long or wide garden, you don’t have to sell the land to benefit from it. We can design a separate new home for the plot, apply to Torbay Council for planning permission, and build it while you carry on living next door.

When it’s finished, the house is yours to sell, let or keep for family. As a new name in the S&K Group we don’t trade on past jobs; every project starts the same way: a free, no-obligation appraisal of your garden, then a measured survey and design, then a written quote once the real costs are known.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Torbay Council
Postcodes
TQ3, TQ4
Noon sun, 21 March
About 40°
Shadow from a 5 m eaves line
About 6.1 m
Planning plan
Local Plan
County
Devon

Before you decide in Paignton

In Paignton, applications for a new home in a garden are decided by Torbay Council, which weighs them against the council’s Local Plan and national policy. Officers look at access, privacy, daylight, parking, bins, drainage and how much garden is left for each house, and neighbours can comment during consultation.

We read the local policies and any design guidance before drawing a line, and check the planning history of nearby plots for decisions that show how the council has applied them. If the policy picture is uncertain, pre-application advice lets us test the scheme with officers before the formal application goes in.

Section showing noon sun and shadows in Paignton: about 40 degrees on 21 March and 16 degrees on 21 December21 m21 Mar, noon: sun 40°, shadow 6.1 m21 Dec, noon: sun 16°, shadow 17.3 mExistingNew home
Noon sun in Paignton on 21 March sits about 40° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.1 m. In December the sun is only about 16° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

From first call to decision

If your Paignton plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

Worth checking early

  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.

Paignton: questions to ask

Can I build a house in my garden in Paignton and keep the land?

Yes. On our design and build route you remain the owner while we design the home, apply to Torbay Council for planning, deal with Building Regulations and build it. The finished house can be sold, let or kept for family. Whether your plot can take a house depends on access, space, neighbours and local policy, and the decision rests with the council.

Can the new home in my Paignton garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Can I build a house in my Paignton garden and then sell it?

Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.

Do new homes in Paignton need a structural warranty?

If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.

Other options in Paignton

Build in your garden near Paignton

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.