Build a new home in your garden in Plymouth

If you own a house in Plymouth with a long or wide garden, you don’t have to sell the land to benefit from it. We can design a separate new home for the plot, apply to Plymouth City Council for planning permission, and build it while you carry on living next door.

When it’s finished, the house is yours to sell, let or keep for family. As a new name in the S&K Group we don’t trade on past jobs; every project starts the same way: a free, no-obligation appraisal of your garden, then a measured survey and design, then a written quote once the real costs are known.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Plymouth City Council
Postcodes
PL1, PL2, PL3, PL4, PL5
Noon sun, 21 March
About 40°
Shadow from a 5 m eaves line
About 6.0 m
Planning plan
Local Plan
County
Devon

What the council will look at in Plymouth

Daylight is one of the first things Plymouth City Council will check on a garden house. At midday on 21 March the sun in Plymouth stands roughly 40° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.0 m. On 21 December the sun is only about 16° up and shadows stretch far longer.

That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.

Section showing noon sun and shadows in Plymouth: about 40 degrees on 21 March and 16 degrees on 21 December21 m21 Mar, noon: sun 40°, shadow 6.0 m21 Dec, noon: sun 16°, shadow 17.2 mExistingNew home
Noon sun in Plymouth on 21 March sits about 40° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.0 m. In December the sun is only about 16° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

The next steps, locally

If your Plymouth plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  3. Written quote and build

    Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
  • You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
  • Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.

Plymouth: questions to ask

How close can a new house be to my own in Plymouth?

There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Plymouth City Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.

Can the new home in my Plymouth garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

How long does planning take for a new home in a Plymouth garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Who decides planning for a garden house in Plymouth?

Plymouth City Council decides applications for addresses in Plymouth, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.

Other options in Plymouth

Build in your garden near Plymouth

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.