Before you decide in Havering
Access is where a garden plot anywhere in RM1, RM2, RM3 and RM11 tends to succeed or fail. A new drive needs enough width for cars, clear visibility where it meets the road, and enough distance from neighbouring windows to keep noise and headlights in check.
Policies in the council’s Local Plan, along with any highways advice the council receives, decide the detail for your address. We measure the gap beside your house on the first visit, and if it’s too tight for a home that can be approved and built safely, we’ll tell you before any design fees are spent.
How we’d take it forward in Havering
If your Havering plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.
Free plot appraisal
We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.
Survey and design
A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.
Written quote and build
Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.
Handover
You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.
Worth checking early
- A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
- You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
- Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
Questions about garden plots in Havering
Can the new home in my Havering garden connect to the main sewer?
Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.
How close can a new house be to my own in Havering?
There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by the London Borough of Havering decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.
How long does planning take for a new home in a Havering garden?
The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.
Will I pay Community Infrastructure Levy on a new home in Havering?
Only if the London Borough of Havering has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.
Other options in Havering
- Sell part of your garden
- Joint venture on your garden plot
- Combine gardens with your neighbours
- Planning permission for a garden plot
- Corner and side plots
- Bungalows on large plots