What shapes a plot in Caerphilly
Daylight is one of the first things Caerphilly County Borough Council will check on a garden house. At midday on 21 March the sun in Caerphilly stands roughly 38° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.3 m. On 21 December the sun is only about 15° up and shadows stretch far longer.
That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.
The next steps, locally
If your Caerphilly plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.
Free plot appraisal
We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.
Survey and design
A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.
Written quote and build
Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.
Handover
You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.
Worth checking early
- You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
- Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
- A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.
Caerphilly: questions to ask
Who decides planning for a garden house in Caerphilly?
Caerphilly County Borough Council decides applications for addresses in Caerphilly, using the council’s Local Development Plan (LDP), national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.
Will I pay Community Infrastructure Levy on a new home in Caerphilly?
Only if Caerphilly County Borough Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.
Can I build a house in my Caerphilly garden and then sell it?
Yes. You keep the land while the home is built, then sell the finished house. Before building starts, the plot should be given its own title through a transfer of part at HM Land Registry, and if your house is mortgaged your lender must agree to release the plot. Selling a home you’ve built can change your tax position, so take advice from a tax adviser first.
Do new homes in Caerphilly need a structural warranty?
If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.
Other options in Caerphilly
- Garage courts and yards
- Sell subject to planning
- Large rear gardens
- Bungalows on large plots
- Combine gardens with your neighbours
- Planning permission for a garden plot