Build a new home in your garden in Deal

Keep the land, gain a home: that is the design and build route we offer to garden owners in Deal. Instead of selling a plot to a developer, you commission the new house yourself, with us managing design, planning, approvals and construction on your behalf.

It suits owners who can fund a build, or arrange finance for one, and who want the finished home rather than a land sale. If that isn’t you, our sell-or-partner routes may fit better, and the free appraisal compares both for your plot so you can choose with the facts in front of you.

Timber-frame house under construction with scaffolding at the bottom of a back garden, seen from the patio
Planning authority
Dover District Council
Postcodes
CT14
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.2 m
Planning plan
Local Plan
County
Kent

Deal: light, access and policy

Construction on a Deal garden plot runs to a programme agreed once Dover District Council has issued permission and any pre-commencement conditions have been dealt with. Groundworks and foundations come first; the shell and roof follow, then glazing, internal trades and, last of all, the drive and planting.

Weather matters. Around 21 December the sun in Deal climbs to only about 15° at midday, so winter days are short and wet ground slows the work. Where we can, we order the job so the house is weathertight before the worst months arrive.

Section showing noon sun and shadows in Deal: about 39 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.2 m21 Dec, noon: sun 15°, shadow 18.2 mExistingNew home
This section is worked out for the latitude of Deal: around 39° of sun at midday in late March and about 15° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

What happens next in Deal

If your Deal plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.

  1. Free plot appraisal

    We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.

  2. Survey and design

    A measured survey records levels, boundaries, trees and neighbouring windows. We then design a layout and house that suit the plot, the street and your budget, and decide whether pre-application advice is worth seeking.

  3. Planning and approvals

    We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.

  4. Handover

    You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.

Worth checking early

  • Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
  • Building and selling a new home can change your tax position compared with selling only your house; take advice from a tax adviser first.
  • A build next door means months of noise, deliveries and contractors near your home; good planning reduces the disruption but doesn’t remove it.

Deal: questions to ask

Will I pay Community Infrastructure Levy on a new home in Deal?

Only if Dover District Council has adopted a Community Infrastructure Levy charging schedule; not every council has. Where it applies, it can be charged on a new home of any size. A self-build exemption exists for people building a home to live in, but it must be claimed before work starts, so we check the position at design stage.

How long does planning take for a new home in a Deal garden?

The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.

Can the new home in my Deal garden connect to the main sewer?

Usually, yes, but the route and depth decide how easily. The new home needs its own foul connection, agreed with the water company, and gravity drainage is simplest where the sewer sits lower than the new floor. If it doesn’t, a pumped connection may be needed. Where a public sewer runs under your garden, a build-over agreement or diversion may also be required.

Who decides planning for a garden house in Deal?

Dover District Council decides applications for addresses in Deal, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.