Before you decide in Broadstairs
Daylight is one of the first things Thanet District Council will check on a garden house. At midday on 21 March the sun in Broadstairs stands roughly 39° above the horizon, so an eaves line about 5 m high casts a shadow of around 6.3 m. On 21 December the sun is only about 15° up and shadows stretch far longer.
That’s why the gap between your house and the new one, and the height of the new roof, are set by measurement rather than guesswork. A lower eaves line, a hipped roof or a single-storey section can make a real difference to the gardens either side.
What happens next in Broadstairs
If your Broadstairs plot already has planning permission, we begin by checking the approved drawings and conditions against the site. Some permissions need detailed design, discharge of conditions or a minor amendment before they can be built. We then prepare the technical drawings, arrange Building Regulations approval and the warranty, apply for utility connections and give you a written quote to build.
Free plot appraisal
We check the title plan, access, constraints and planning policy from our desk, talk the plot through with you, and visit if it looks viable. There’s no cost and no obligation.
Planning and approvals
We submit the planning application and manage it to a decision, then deal with conditions, Building Regulations approval, the structural warranty, any build-over agreement and the new utility connections.
Written quote and build
Once design and survey are complete you get a written quote. The build runs in stages — access and groundworks, foundations, frame and roof, fit-out and external works — with inspections at each key point.
Handover
You receive the completion certificate, warranty documents, Energy Performance Certificate, manuals and utility details, so the new home is ready to move into, let or put on the market.
Worth checking early
- Your own garden gets smaller and the new home will be visible from your house, so screening and separation matter for both homes.
- Planning can be refused, and money spent on surveys, design and the application isn’t recovered if it is — which is why we start with an appraisal.
- You fund the build and carry the cost risk; ground conditions, sewer diversions or supply upgrades found later can move the price.
Your questions, answered for Broadstairs
Do new homes in Broadstairs need a structural warranty?
If the house will ever be sold or mortgaged, in practice yes. Mortgage lenders usually expect a 10-year structural warranty on a new home, though some accept an architect’s or surveyor’s certificate, and a warranty provider inspects the work at stages during the build, so it has to be in place before construction starts. Building control approval is separate and also required; a buyer’s solicitor will ask for both.
How close can a new house be to my own in Broadstairs?
There’s no single national distance. Many councils use separation guides of around 21 metres between facing back windows and around 12 to 15 metres between a back window and a blank side wall, but the guidance used by Thanet District Council decides. Window positions, ground levels, roof shape and screening all affect what is acceptable, which is why we survey before we design.
Who decides planning for a garden house in Broadstairs?
Thanet District Council decides applications for addresses in Broadstairs, using the council’s Local Plan, national policy and its own design guidance. Neighbours and consultees such as highways officers can comment, and the decision is made by the council’s planning officers or, where the rules allow, its planning committee. Pre-application advice from the council can help test a scheme before the formal application is submitted.
How long does planning take for a new home in a Broadstairs garden?
The statutory period for deciding a minor application, such as a single new home, is 8 weeks from the date the council receives a valid application, in both England and Wales. In practice many applications take longer, and the council may ask you to agree an extension in writing. Surveys and design before submission add time, and conditions may need approving afterwards.
Other options in Broadstairs
- Large rear gardens
- Garden plot option agreement
- Combine gardens with your neighbours
- Planning promotion for your garden plot
- Garage courts and yards
- Planning permission for a garden plot