Garden plot feasibility and design in Brecon

A feasibility study for a Brecon garden plot ends with a straight answer: yes, no or maybe. Yes comes with a scheme that looks capable of planning permission. No comes with the reason. Maybe comes with what would need to change, such as a covenant released or a neighbour’s agreement.

From there you can apply for planning, build on the land, sell it or bring in a partner, or simply leave things as they are. We cover homes in and around Brecon, and the first step, a free plot appraisal, costs nothing and commits you to nothing. You also keep every drawing and report you pay for.

Surveyor in a hi-vis vest taking GPS measurements in a long suburban back garden
Planning authority
Bannau Brycheiniog National Park Authority
Postcodes
LD3
Noon sun, 21 March
About 38°
Shadow from a 5 m eaves line
About 6.4 m
Planning plan
LDP
County
Powys

How it plays out in Brecon

Daylight is one of the first things Bannau Brycheiniog National Park Authority will test on a garden scheme, so we test it first too. At midday on 21 March the sun over Brecon sits about 38° above the horizon, and a typical two-storey eaves line around 5 m high throws a shadow of roughly 6.4 m. In late December the noon sun reaches only about 15°, so winter shadows run roughly three times longer. Plotting both on the measured survey shows where a new home can stand without darkening the gardens and rooms around it.

Section showing noon sun and shadows in Brecon: about 38 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 38°, shadow 6.4 m21 Dec, noon: sun 15°, shadow 19.2 mExistingNew home
This section is worked out for the latitude of Brecon: around 38° of sun at midday in late March and about 15° at midwinter. It shows why the gap between your house and a new home behind it is about light as well as privacy. Garden assumed to face north.

What happens next in Brecon

Getting a straight answer about a garden plot in Brecon costs nothing at the first stage. Send us a few photos and a rough idea of the plot, or call, and we’ll check it from the desk. If it’s not worth pursuing, we’ll say so and explain why. If it is, we’ll set out the next steps and their cost in writing.

  1. Free plot appraisal

    A desktop look at your plot, access, title plan and the planning picture, plus a conversation about what you want. If it looks viable we visit. There’s no cost and no obligation at this stage.

  2. Scope and written quote

    If you want to go further, we set out which surveys and checks your plot needs and what they will cost, in writing. Nothing is commissioned until you have agreed the scope and the price.

  3. Survey and constraints check

    A measured survey of the plot and its surroundings, then a check of the title, services, trees, flood risk and heritage designations, so the design starts from facts rather than guesses.

  4. Concept designs and pre-application

    Sketch layouts and simple elevations for the strongest options. Where it will help, we take one to the council for pre-application advice before anything is submitted.

Worth checking early

  • Some ecology surveys can only be done at certain times of year, which can affect the programme.
  • Pre-application advice is not binding, and the council’s decision on a formal application can still differ.
  • A feasibility study can end in a no; finding that out early costs far less than a refused application.

Your questions, answered for Brecon

Is my Brecon garden in a flood zone or conservation area?

Both are public information. Flood zones are shown on the flood maps for planning in Wales, and Bannau Brycheiniog National Park Authority publishes its conservation area boundaries and the listed buildings in its area. We check these as part of the free appraisal, along with Tree Preservation Orders, because each one changes what a scheme needs to show.

Do I have to use you for planning after a feasibility study in Brecon?

No. The survey, report and concept designs are yours to use as you choose. You can take the scheme forward with us, through our planning permission or design and build services, or sell or partner on the plot with us, or use another firm. We would rather you made the decision that suits you.

How much does a feasibility study cost in Brecon?

It depends on the plot. A simple garden with a clear drive needs less work than one with protected trees, a flood zone or a complicated title. The first appraisal is free. After that we set out the scope and the price in writing, and you choose whether to go ahead before anything is commissioned.

Can you check the title deeds on my Brecon property?

Yes. We obtain the title register and title plan from HM Land Registry and read them for restrictive covenants, rights of way, easements and any mortgage charge. If something needs a legal opinion, we flag it so your solicitor can advise. Title issues are far better found during feasibility than halfway through a planning application or a sale.

Other options in Brecon

Feasibility and design near Brecon

Find out what your garden could become

Free garden plot appraisal. No cost, no obligation, and a straight answer if it won’t work.