Before you start in Powys
Some constraints in Powys only show up in public records and title documents. Flood zones, conservation areas, listed buildings, Tree Preservation Orders and public sewers are all mapped, and covenants and rights of way sit on the title register. A feasibility study pulls these together before design starts, so the concept designs avoid them or show how they would be dealt with. On new homes you also need approval from the SuDS Approval Body (SAB) before building starts, which can affect where the building sits.
Planning authorities covering Powys include Powys County Council, Bannau Brycheiniog National Park Authority.
How it works
Free plot appraisal
A desktop look at your plot, access, title plan and the planning picture, plus a conversation about what you want. If it looks viable we visit. There’s no cost and no obligation at this stage.
Scope and written quote
If you want to go further, we set out which surveys and checks your plot needs and what they will cost, in writing. Nothing is commissioned until you have agreed the scope and the price.
Survey and constraints check
A measured survey of the plot and its surroundings, then a check of the title, services, trees, flood risk and heritage designations, so the design starts from facts rather than guesses.
Access and capacity study
We test each workable route in and the number, size and position of homes the plot could hold, against separation distances, garden space, parking, bins and daylight for neighbours.
Concept designs and pre-application
Sketch layouts and simple elevations for the strongest options. Where it will help, we take one to the council for pre-application advice before anything is submitted.
Feasibility report and options
A clear yes, no or maybe, the reasons behind it, and the routes open to you: apply for planning, build, sell or partner. You decide what happens next, with no obligation to use us for it.
Feasibility and design in towns across Powys
Questions about feasibility and design in Powys
What constraints usually affect garden plots in Powys?
Access is usually the biggest, followed by the distance from neighbours’ windows and the space left for the existing house. Title issues such as covenants and rights of way, public sewers, protected trees, flood risk and heritage designations can also apply. A feasibility study checks each one for your plot rather than relying on general rules.
What happens after a feasibility study in Powys?
You choose. With a clear yes or a promising maybe, you might apply for planning, build a home on the plot, or sell or partner on it. With a no, you have the reasons and the evidence. Whichever way you go, the report, survey and concept designs remain yours to use.
Is pre-application advice available in Powys?
Most councils offer it, usually for a fee, and publish their arrangements online. It gives you a planning officer’s written view on the principle and design of a scheme before you apply. It isn’t binding, but on a finely balanced garden plot it often shows what the council will focus on.
How long does planning take for a garden plot in Powys?
The council usually has eight weeks from validation to decide a small application, though extensions are often agreed, and the whole process takes longer. Surveys, design work, pre-application advice and amendments all add time, and some ecology surveys can only be done at certain times of year. We’ll give you a realistic timetable for your plot rather than a promise.