Garden plot feasibility and design in Dorking

A feasibility study for a Dorking garden plot ends with a straight answer: yes, no or maybe. Yes comes with a scheme that looks capable of planning permission. No comes with the reason. Maybe comes with what would need to change, such as a covenant released or a neighbour’s agreement.

From there you can apply for planning, build on the land, sell it or bring in a partner, or simply leave things as they are. We cover homes in and around Dorking, and the first step, a free plot appraisal, costs nothing and commits you to nothing. You also keep every drawing and report you pay for.

Surveyor in a hi-vis vest taking GPS measurements in a long suburban back garden
Planning authority
Mole Valley District Council
Postcodes
RH4
Noon sun, 21 March
About 39°
Shadow from a 5 m eaves line
About 6.2 m
Planning plan
Local Plan
County
Surrey

Before you decide in Dorking

Any capacity study for a garden in Dorking starts with the policies in the council’s Local Plan and any design guidance Mole Valley District Council has adopted for homes in gardens. Those documents set the tests the scheme will be judged against: character, separation, garden size, parking and access. Some councils also have specific policies on backland or tandem development. We read the current versions for your address and draw the concept options to meet them, which makes a later application far easier to defend.

Section showing noon sun and shadows in Dorking: about 39 degrees on 21 March and 15 degrees on 21 December21 m21 Mar, noon: sun 39°, shadow 6.2 m21 Dec, noon: sun 15°, shadow 18.2 mExistingNew home
Noon sun in Dorking on 21 March sits about 39° above the horizon, so a typical two-storey eaves line (about 5 m) throws a shadow of roughly 6.2 m. In December the sun is only about 15° up and shadows stretch much further. Drawn for a garden facing north, where it matters most.

The next steps, locally

The next step is a free appraisal of your Dorking garden. We look at the access, the shape of the plot, the title plan and the main planning constraints, then talk it through with you. Where the plot shows promise, we set out the surveys and design work it needs, with a written price for each stage, and you decide how far to take it.

  1. Free plot appraisal

    A desktop look at your plot, access, title plan and the planning picture, plus a conversation about what you want. If it looks viable we visit. There’s no cost and no obligation at this stage.

  2. Survey and constraints check

    A measured survey of the plot and its surroundings, then a check of the title, services, trees, flood risk and heritage designations, so the design starts from facts rather than guesses.

  3. Access and capacity study

    We test each workable route in and the number, size and position of homes the plot could hold, against separation distances, garden space, parking, bins and daylight for neighbours.

  4. Concept designs and pre-application

    Sketch layouts and simple elevations for the strongest options. Where it will help, we take one to the council for pre-application advice before anything is submitted.

Worth checking early

  • Some ecology surveys can only be done at certain times of year, which can affect the programme.
  • A capacity figure is not a value; what a plot is worth depends on location, size, access and planning.
  • Title problems such as covenants, ransom strips or missing rights of way can take time and money to resolve.

Your questions, answered for Dorking

Can you check the title deeds on my Dorking property?

Yes. We obtain the title register and title plan from HM Land Registry and read them for restrictive covenants, rights of way, easements and any mortgage charge. If something needs a legal opinion, we flag it so your solicitor can advise. Title issues are far better found during feasibility than halfway through a planning application or a sale.

What if my Dorking garden plot fails the feasibility check?

Then you know before spending money on a planning application, and you know why. Sometimes a smaller scheme, an annexe, or working with the neighbours next door changes the answer, and we will say if so. If nothing does, you keep the survey and the report for the future. You are under no obligation to us either way.

How much does a feasibility study cost in Dorking?

It depends on the plot. A simple garden with a clear drive needs less work than one with protected trees, a flood zone or a complicated title. The first appraisal is free. After that we set out the scope and the price in writing, and you choose whether to go ahead before anything is commissioned.

Is my Dorking garden in a flood zone or conservation area?

Both are public information. Flood zones are shown on the flood maps for planning in England, and Mole Valley District Council publishes its conservation area boundaries and the listed buildings in its area. We check these as part of the free appraisal, along with Tree Preservation Orders, because each one changes what a scheme needs to show.

Other options in Dorking

Feasibility and design near Dorking